PR0T
"Still within the first 24h of operations, some progress has been done", it was reported on 17 November at 13.32 UTC. "Two fully operational stations are on the air. A fully remote FT8 station and a local SSB/CW station. All the operation till now is being run in low power. Later today, the team hopes to have HP available. The goal is to keep on exploring the maximum of 12m and 17m on FT8 and the other bands on SSB/CW. The team is aware of some technical problems regarding the delay on the realtime logging. The IT team is already dealing with that". See https://www.pr0t.com.br for updates.